42-367-00196

Final Completion

SULLIVAN-DONALDSON

PARKER County · District 9 · MITCHELL ENERGY CORPORATION · DALY (CADDO LOWER)

Permits

1

Max Depth

5,925 ft

First Permit

1983-06-07

Latest Activity

1983-06-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-09-14

Shut-In

Plugged

2000-09-29

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2000-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,846–3,903 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"332 ft125 sx
2.375"3,886 ft
4.5"3,975 ft275 sx

Permit History (1)

Applications (1)

#197542 A MITCHELL ENERGY CORPORATION
received 1983-06-07

Records & Logs

2 completion filings on record.

W-2/G-1 1983-10-11
W-2/G-1 1984-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PARKER County.

Well Details

Well Number
1
Max Depth
5,925 ft
Drill Type
Vertical
County
PARKER
District
9
Completed
1983-09-14

Operator

Location
HOUSTON
P-5 Status
Inactive (filed 2000-07-18)
Cum Oil (all leases)
9,163,267 bbl
Cum Gas (all leases)
784,959,931 mcf
Total Permits
4,224