42-367-30770

Final Completion

HARRIS "E"

PARKER County · District 7 · U.S. ENERGY, INC.

Permits

2

Max Depth

5,635 ft

First Permit

1977-06-07

Latest Activity

1978-08-25

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1977-07-01

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,346–4,356 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"995 ft450 sx
2.375"4,310 ft
4.5"5,550 ft280 sx

Permit History (2)

Applications (2)

#31412 A U.S. ENERGY, INC.
received 1978-08-25
#239 A DORCHESTER EXPLORATION, INC.
received 1977-06-07

Records & Logs

1 completion filing on record.

W-2/G-1 1979-10-11

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PARKER County.

Well Details

Well Number
1
Max Depth
5,635 ft
Drill Type
Vertical
County
PARKER
District
7

Operator

Location
FARMERS BRN, CH
P-5 Status
Inactive (filed 1985-10-22)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
41