Permits
1
Max Depth
4,000 ft
First Permit
1981-12-09
Latest Activity
1981-12-09
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-09-08
Shut-In
—
Plugged
1987-10-02
EWA / Permit operator mismatch
Scheduling: GROW-TEX INC. ≠ Permit: WAY-CO
Resolved via: scheduling → GROW-TEX INC.
Operator History
originally filed by WAY-CO — asset transferred
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (2)
| Interval | Type |
|---|---|
| 2,700–2,704 ft | Perforated |
| 3,562–3,586 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 211 ft | 155 sx |
| 8.625" | 211 ft | 155 sx |
| 2.375" | 3,500 ft | — |
| 4.5" | 3,650 ft | 300 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- PARKER
- District
- 7
- Operator
- GROW-TEX INC.
- Completed
- 1983-09-08
Operator
- Name
- GROW-TEX, INC
- Location
- PADUCAH
- P-5 Status
- Inactive (filed 1987-11-16)
- Total Permits
- 31