42-367-32588
Final CompletionCITY OF MINERAL WELLS
PARKER County · District 7 · SMITH PIPE OF ABILENE · GARNER N.W. (4475)
Permits
1
Max Depth
4,700 ft
First Permit
1983-09-06
Latest Activity
1983-09-06
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-10-01
Shut-In
—
Plugged
1997-04-03
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: RIDGE OIL COMPANY (reported 1994-07)
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: RIDGE OIL COMPANY
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1997-04
Injection / Disposal
Permitted Volume
100 bbl/d
Max Pressure
1,200 psi
Injection Interval
4,180–4,184 ft
Injected (12mo)
—
Operator History
originally filed by RIDGE OIL COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 4,462–4,468 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 337 ft | 235 sx |
| 2.375" | 4,364 ft | — |
| 4.5" | 4,615 ft | 175 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 4
- Max Depth
- 4,700 ft
- Drill Type
- Vertical
- County
- PARKER
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1983-10-01
Operator
- Location
- ABILENE
- P-5 Status
- Inactive (filed 2014-08-29)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf