Permits
2
Max Depth
4,900 ft
First Permit
1981-03-11
Latest Activity
1990-02-09
Lifespan
9 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 4,452–4,549 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 416 ft | 475 sx |
| 8.625" | 3,202 ft | 1,300 sx |
| 2.375" | 4,378 ft | — |
| 5.5" | 4,815 ft | 475 sx |
Permit History (2)
Applications (2)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet