42-371-36597

Final Completion

LONGFELLOW

PECOS County · District 8 · SANDRIDGE ENERGY INC. · PINON (CABALLOS)

RRC Lookup

Permits

1

Max Depth

9,000 ft

First Permit

1996-04-17

Latest Activity

1996-04-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-07-16

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: SANDRIDGE ENERGY INC. ≠ Production: LONGFELLOW ENERGY, LP (reported 2025-11)

!

EWA / Permit operator mismatch

Scheduling: SANDRIDGE ENERGY INC. ≠ Permit: RIATA ENERGY, INC.

Resolved via: productionLONGFELLOW ENERGY, LP

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-07

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#447142 A RIATA ENERGY, INC.
received 1996-04-17

Well Details

Well Number
4
Max Depth
9,000 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
1997-07-16

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2009-08-07)
Cum Oil (all leases)
186,349 bbl
Cum Gas (all leases)
230,778,023 mcf
Total Permits
698

External Links

Live © 2026 Petrora