42-371-36906

Final Completion

LONGFELLOW

PECOS County · District 8 · SANDRIDGE ENERGY INC. · BITTERWEED S. (CABALLOS)

RRC Lookup

Permits

2

Max Depth

9,000 ft

First Permit

1999-03-31

Latest Activity

2002-10-28

Lifespan

4 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1999-10-22

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: SANDRIDGE ENERGY INC. ≠ Production: LONGFELLOW ENERGY, LP (reported 2025-06)

!

EWA / Permit operator mismatch

Scheduling: SANDRIDGE ENERGY INC. ≠ Permit: RIATA ENERGY, INC.

Resolved via: schedulingSANDRIDGE ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1999-10

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#525010 A RIATA ENERGY, INC.
received 2002-10-28
#483628 A RIATA ENERGY, INC.
received 1999-03-31

Well Details

Well Number
4010
Max Depth
9,000 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
1999-10-22

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2009-08-07)
Cum Oil (all leases)
186,349 bbl
Cum Gas (all leases)
230,778,023 mcf
Total Permits
698

External Links

Live © 2026 Petrora