42-371-39091

PRODUCING

STATE MCINTYRE

PECOS County · District 8 · XTO ENERGY INC. · ROJO CABALLOS SOUTH (DEVONIAN)

RRC Lookup

Permits

2

Max Depth

16,500 ft

First Permit

2013-06-12

Latest Activity

2013-06-12

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2014-01-30

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: XTO ENERGY INC. ≠ Permit: APACHE CORPORATION

Resolved via: productionXTO ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2014-01

Last Production

2026-03

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#764130 A APACHE CORPORATION
received 2013-08-15
#764130 A APACHE CORPORATION
received 2013-06-06

Well Details

Well Number
3
Max Depth
16,500 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
2014-01-30

Operator

Location
SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
755,132,920 bbl
Cum Gas (all leases)
11,012,998,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,136

External Links

Live © 2026 Petrora