42-373-30395

BRENT C. L. UNIT

POLK County · District 3 · INTERCOASTAL GAS EXPLORATION · HORTENSE (WOODBINE)

Permits

1

Max Depth

13,750 ft

First Permit

1978-02-15

Latest Activity

1978-02-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1978-05-12

Shut-In

Plugged

1987-09-11

!

EWA / Permit operator mismatch

Scheduling: INTERCOASTAL GAS EXPLORATION ≠ Permit: MITCHELL ENERGY CORPORATION

Resolved via: schedulingINTERCOASTAL GAS EXPLORATION

Operator History

originally filed by MITCHELL ENERGY CORPORATION — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
13,046–13,110 ftPerforated

Casing (3)

SizeSet DepthCement
10.75"2,230 ft980 sx
7"12,868 ft620 sx
2.875"12,945 ft

Permit History (1)

Applications (1)

#18739 A MITCHELL ENERGY CORPORATION
received 1978-02-15

Records & Logs

1 completion filing on record.

W-2/G-1 1978-06-30

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in POLK County.

Well Details

Well Number
1
Max Depth
13,750 ft
Drill Type
Vertical
County
POLK
District
3
Completed
1978-05-12

Operator

Location
BEASLEY
P-5 Status
Inactive (filed 1992-02-03)
Cum Oil (all leases)
168 bbl
Cum Gas (all leases)
— mcf