Permits
1
Max Depth
3,400 ft
First Permit
1988-03-25
Latest Activity
1988-03-25
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1992-05-06
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4) Elevation 2,999 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| TUBB | 2,018 ft | +981 ft |
| RED CAVE | 2,474 ft | +525 ft |
| PANHANDLE LIME | 2,752 ft | +247 ft |
| BROWN DOLOMITE | 3,070 ft | -71 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 2,500–2,505 ft | Perforated |
| 2,510–2,518 ft | Perforated |
| 2,528–2,532 ft | Perforated |
| 2,537–2,539 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 410 ft | 300 sx |
| 5.5" | 3,037 ft | 140 sx |
Permit History (1)
Applications (1)
Records & Logs
3 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1028
- Max Depth
- 3,400 ft
- Drill Type
- Vertical
- County
- POTTER
- District
- 10
- Operator
- BAKER & TAYLOR DRILLING CO.
Operator
- Location
- AMARILLO
- P-5 Status
- Inactive (filed 1990-12-04)
- Total Permits
- 206