42-389-37934

Final Completion Horizontal

HURLEY 56-18

REEVES County · District 8 · XTO ENERGY INC. · PHANTOM (WOLFCAMP)

Permits

1

Max Depth

9,500 ft

First Permit

2019-01-10

Latest Activity

2019-01-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2019-07-29

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2016-07

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (21) Elevation 2,846 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
CASTILLE (Castile)80 ft+2,766 ft
CASTILLE (Castile)2,789 ft+57 ft
BELL CANYON 2,997 ft-151 ft
DELAWARE 2,997 ft-151 ft
CHERRY CANYON 3,922 ft-1,076 ft
BONE SPRINGS (Bone Spring)6,705 ft-3,859 ft
BONESPRING 1 (Bone Spring)7,635 ft-4,789 ft
BONESPRING17,635 ft-4,789 ft
BONESPRING 2 (Bone Spring)8,223 ft-5,377 ft
BONESPRING 3 (Bone Spring)8,840 ft-5,994 ft
BONESPRING38,840 ft-5,994 ft
AVALON
DELAWARE CONSOLIDATED GAS (Delaware)
FBSG
FORD-DELAWARE (Delaware)
KOP
LP
SBSG
TARGET BASE
TARGET TOP
TBSG SHALE

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-389-37935 HURLEY 56-18 · XTO ENERGY INC.
0.0 mi
Castile 2,799'Delaware 2,996'Bell Canyon 2,996'Cherry Canyon 3,928'Bone Spring 6,705'BONESPRING1 7,629'Bone Spring 7,629'BONESPRING2 8,239'Bone Spring 8,239'Bone Spring 8,865'BONESPRING3 8,865'Permian (undifferentiated) +7 more
42-389-36931 HURLEY 56-18 · XTO ENERGY INC.
0.1 mi
Delaware 2,995'Cherry Canyon 3,929'Delaware 3,929'Bone Spring 6,709'Cherry Canyon 6,709'Wolfcamp 9,796'Bone Spring 9,796'Wolfcamp Bell Canyon Pennsylvanian Castile Permian (undifferentiated) +2 more
42-389-36929 HURLEY 56-18 · XTO ENERGY INC.
0.1 mi
Castile 2,791'Delaware 2,974'Bell Canyon 2,974'Delaware 2,981'Cherry Canyon 3,835'Cherry Canyon 3,910'Bone Spring 6,655'Bone Spring 6,689'Wolfcamp 9,787'Permian (undifferentiated) Pennsylvanian Castile +3 more
42-389-36930 HURLEY 56-18 · XTO ENERGY INC.
0.1 mi
Delaware 3,008'Cherry Canyon 3,926'Bone Spring 6,674'Pennsylvanian Bell Canyon Mississippian Castile Permian (undifferentiated) Delaware Delaware Wolfcamp
42-389-36934 HURLEY 56-18 · XTO ENERGY INC.
0.1 mi
Delaware 2,970'Cherry Canyon 3,920'Bone Spring 6,612'Permian (undifferentiated) 9,778'Wolfcamp 9,778'Delaware Bell Canyon Wolfcamp Pennsylvanian Castile Delaware Permian (undifferentiated)
42-389-36871 HURLEY 56-18 · XTO ENERGY INC.
0.3 mi
Cherry Canyon 2,961'Delaware 3,003'Cherry Canyon 3,938'Bone Spring 6,716'Wolfcamp 9,782'Permian (undifferentiated) Pennsylvanian Castile Delaware Bell Canyon Delaware
42-389-36873 HURLEY 56-18 · XTO ENERGY INC.
0.3 mi
Delaware 3,010'Cherry Canyon 3,945'Bone Spring 6,725'Wolfcamp 9,786'Delaware Bell Canyon Pennsylvanian Castile Permian (undifferentiated) Delaware
42-389-36872 HURLEY 56-18 · XTO ENERGY INC.
0.3 mi
Delaware 3,005'Cherry Canyon 3,938'Bone Spring 6,720'Castile Delaware Permian (undifferentiated) Delaware Bell Canyon Wolfcamp Mississippian Pennsylvanian

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
9,620–14,488 ftPerforated

Casing (3)

SizeSet DepthCement
11.75"2,833 ft3,085 sx
8.625"8,357 ft1,216 sx
5.5"14,645 ft1,112 sx

Permit History (1)

Applications (1)

#848524 A XTO ENERGY INC.
received 2019-01-09

Records & Logs

3 completion filings on record · 2 with log images at RRC.

W-2/G-1 2021-07-16 log on file
W-2/G-1 2019-10-15
W-2/G-1 2019-09-13 log on file
Completion packets + logs ↗ Wellbore filings ↗

Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.

Lat 31.855421
Lon -103.906108

Well Details

Well Number
30H
Max Depth
9,500 ft
Drill Type
Horizontal
County
REEVES
District
8
Completed
2019-07-29

Operator

Location
SPRING
P-5 Status
X (filed 2026-04-08)
Cum Oil (all leases)
772,419,164 bbl
Cum Gas (all leases)
11,039,899,986 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,138