Permits
2
Max Depth
6,367 ft
First Permit
1989-11-13
Latest Activity
2026-04-29
Lifespan
36 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2) Elevation 3,049 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| LOWER ALBANY DOLOMITE | 3,942 ft | -893 ft |
| LECOMPTON | 6,220 ft | -3,171 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 3,942–4,008 ft | Perforated |
| 4,016–4,030 ft | Perforated |
| ?–6,227 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 1,369 ft | 1,000 sx |
| 7" | 6,365 ft | 1,775 sx |
Permit History (2)
Applications (2)
Records & Logs
3 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 43A
- Max Depth
- 6,367 ft
- Drill Type
- Vertical
- County
- ROBERTS
- District
- 10
- Operator
- PANTERA ENERGY COMPANY
Operator
- Name
- PANTERA ENGY CO
- Location
- AMARILLO
- P-5 Status
- Active (filed 2025-10-01)
- Cum Oil (all leases)
- 1,716,221 bbl
- Cum Gas (all leases)
- 248,842,138 mcf
- Activities
- GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 359