42-399-10184

Final Completion

EVANS LUCIUS S.

RUNNELS County · District 7 · DAL-PETRO INC. · MOTLEY NORTH (PALO PINTO)

Permits

1

Max Depth

4,650 ft

First Permit

1978-09-05

Latest Activity

1978-09-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1978-11-15

Shut-In

Plugged

1986-08-05

Formation Tops (6) Elevation 1,831 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
VALARO1,485 ft+346 ft
COLEMAN JUNCTION 1,590 ft+241 ft
COLEMAN JUNCTION 1,840 ft-9 ft
PALO PINTO 3,810 ft-1,979 ft
MORRIS LIME4,075 ft-2,244 ft
GOEN LIME4,320 ft-2,489 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
3,845–3,849 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"211 ft
2.875"4,330 ft250 sx
2.875"4,330 ft

Permit History (1)

Applications (2)

#31987 A DAL-PETRO INC.
received 1984-10-19
#31987 A PERKINS, RONALD R.
received 1978-09-05

Records & Logs

2 completion filings on record.

W-2/G-1 1984-09-21
W-2/G-1 1984-09-28

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in RUNNELS County.

Well Details

Well Number
B-1
Max Depth
4,650 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
1978-11-15

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1995-07-31)
Total Permits
1