42-399-34460

Final Completion

HOELSCHER/SCHWERTNER 2A

RUNNELS County · District 7 · MEMORIAL PRODUCTION OPER. LLC · PIONEER-MILLER (GARDNER LIME)

RRC Lookup

Permits

2

Max Depth

4,300 ft

First Permit

1996-07-02

Latest Activity

2012-03-23

Lifespan

16 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2010-07-28

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: MEMORIAL PRODUCTION OPER. LLC ≠ Production: SIMPSON OPERATING SERVICES, LP (reported 2025-10)

!

EWA / Permit operator mismatch

Scheduling: MEMORIAL PRODUCTION OPER. LLC ≠ Permit: BOAZ ENERGY, LLC

Resolved via: schedulingMEMORIAL PRODUCTION OPER. LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-08

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#734236 A BOAZ ENERGY, LLC
received 2012-02-20
#449962 A PIONEER ENERGY CORPORATION
received 1996-07-02

Well Details

Well Number
2A
Max Depth
4,300 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
2010-07-28

Operator

Location
HOUSTON
P-5 Status
Y (filed 2018-08-03)
Cum Oil (all leases)
2,113,008 bbl
Cum Gas (all leases)
205,463,041 mcf
Total Permits
193

External Links

Live © 2026 Petrora