42-399-34460
Final CompletionHOELSCHER/SCHWERTNER 2A
RUNNELS County · District 7 · MEMORIAL PRODUCTION OPER. LLC · PIONEER-MILLER (GARDNER LIME)
Permits
2
Max Depth
4,300 ft
First Permit
1996-07-02
Latest Activity
2012-03-23
Lifespan
16 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2010-07-28
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: MEMORIAL PRODUCTION OPER. LLC ≠ Production: SIMPSON OPERATING SERVICES, LP (reported 2025-10)
!
EWA / Permit operator mismatch
Scheduling: MEMORIAL PRODUCTION OPER. LLC ≠ Permit: BOAZ ENERGY, LLC
Resolved via: scheduling → MEMORIAL PRODUCTION OPER. LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1996-08
Last Production
2026-03
Operator History
Chain of Custody
PIONEER ENERGY CORPORATION 1996-2005→ HUGHES, BOB OIL COMPANY 2005-2007→ BUSTAMANTE OIL COMPANY 2007-2010→ PANAMERICAN OPERATING INC 2010-2010→ BOAZ ENERGY, LLC 2013-2013→ MEMORIAL PRODUCTION OPER. LLC 2013-2016→ BOAZ ENERGY II OPERATING, LLC 2016-2017→ OTEX LLC 2019-2021→ SIMPSON OPERATING SERVICES, LP 2022-2025
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#734236 A BOAZ ENERGY, LLC
received 2012-02-20
#449962 A PIONEER ENERGY CORPORATION
received 1996-07-02
Well Details
- Well Number
- 2A
- Max Depth
- 4,300 ft
- Drill Type
- Vertical
- County
- RUNNELS
- District
- 7
- Operator
- MEMORIAL PRODUCTION OPER. LLC
- Completed
- 2010-07-28
Operator
- Location
- HOUSTON
- P-5 Status
- Y (filed 2018-08-03)
- Cum Oil (all leases)
- 2,113,008 bbl
- Cum Gas (all leases)
- 205,463,041 mcf
- Total Permits
- 193