42-401-33409
TEMP ABANDONEDPIERCE WALTER GAS UNIT NO. 1
RUSK County · District 6 · TGNR EAST TEXAS II LLC · OAK HILL (COTTON VALLEY)
Permits
1
Max Depth
12,000 ft
First Permit
2004-09-21
Latest Activity
2004-09-21
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2006-02-05
Shut-In
—
Plugged
—
P-5 Org Status: Active
EWA / Production operator mismatch
Scheduling: TGNR EAST TEXAS II LLC ≠ Production: ROCKCLIFF ENERGY OPERATING LLC (reported 2017-10)
EWA / Permit operator mismatch
Scheduling: TGNR EAST TEXAS II LLC ≠ Permit: CRATON ENERGY CORPORATION
Resolved via: scheduling → TGNR EAST TEXAS II LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2006-01
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 320 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| COTTON VALLEY | 9,343 ft | -9,023 ft |
| TAYLOR | 10,490 ft | -10,170 ft |
| BOSSIER | 10,773 ft | -10,453 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 10,548–10,554 ft | Perforated |
| 10,638–10,644 ft | Perforated |
| 10,692–10,696 ft | Perforated |
| 10,756–10,758 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 1,000 ft | 370 sx |
| 4.5" | 10,850 ft | 1,380 sx |
Permit History (1)
Applications (1)
Records & Logs
3 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 6
- Max Depth
- 12,000 ft
- Drill Type
- Vertical
- County
- RUSK
- District
- 6
- Operator
- TGNR EAST TEXAS II LLC
- Completed
- 2006-02-05
Operator
- Location
- HOUSTON
- P-5 Status
- Active (filed 2026-03-18)
- Cum Oil (all leases)
- 4,042 bbl
- Cum Gas (all leases)
- 1,016,505,153 mcf
- Activities
- G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 139