42-405-30697

PRODUCING Horizontal

ROO GAS UNIT

SAN AUGUSTINE County · District 6 · BPX OPERATING COMPANY · CARTHAGE (HAYNESVILLE SHALE)

Permits

1

Max Depth

19,500 ft

First Permit

2019-05-03

Latest Activity

2019-05-03

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2020-01-03

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: BPX OPERATING COMPANY ≠ Permit: BP AMERICA PRODUCTION COMPANY

Resolved via: productionBPX OPERATING COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2020-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3) Elevation 243 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
AUSTIN CHALK 4,822 ft-4,579 ft
JAMES LIME 8,056 ft-7,813 ft
HAYNESVILLE 12,666 ft-12,423 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-405-30658 KANGA GAS UNIT · BP AMERICA PRODUCTION COMPANY
0.8 mi
Austin Chalk 4,896'James Lime 8,121'Bossier 12,732'Haynesville 13,903'
42-405-30659 KANGA GAS UNIT · BP AMERICA PRODUCTION COMPANY
0.8 mi
Austin Chalk 4,896'James Lime 8,121'Haynesville 12,731'
42-405-30878 BROWN-WEEKS ALLOC B · EXCO OPERATING COMPANY, LP
1.8 mi
Austin Chalk 4,716'Paluxy 5,471'Glen Rose 5,881'Rodessa 6,923'James Lime 7,953'Cotton Valley 11,801'Haynesville 12,482'
42-405-30879 BROWN-WEEKS ALLOC B · EXCO OPERATING COMPANY, LP
1.8 mi
Austin Chalk 4,709'Paluxy 5,486'Glen Rose 5,869'Rodessa 6,926'James Lime 7,958'Cotton Valley 11,637'Haynesville 12,480'
42-405-30645 SUGAR GLIDER GAS UNIT · BP AMERICA PRODUCTION COMPANY
1.8 mi
Austin Chalk 4,939'James Lime 8,188'Haynesville 12,864'
42-405-30644 SUGAR GLIDER GAS UNIT · BP AMERICA PRODUCTION COMPANY
1.8 mi
Austin Chalk 4,942'James Lime 8,182'Haynesville 12,846'
42-405-30670 SUGAR GLIDER GAS UNIT · BP AMERICA PRODUCTION COMPANY
2.0 mi
Austin Chalk 4,985'James Lime 8,188'Haynesville 12,864'
42-405-30669 SUGAR GLIDER GAS UNIT · BP AMERICA PRODUCTION COMPANY
2.0 mi
Austin Chalk 4,939'James Lime 8,188'Haynesville 12,864'

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
15,969–23,115 ftPerforated

Casing (4)

SizeSet DepthCement
9.625"3,018 ft400 sx
13.375"3,476 ft1,760 sx
9.625"12,657 ft345 sx
5.5"25,002 ft1,640 sx

Permit History (1)

Applications (1)

#851518 A BP AMERICA PRODUCTION COMPANY
received 2019-03-27

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2024-02-15
W-2/G-1 2020-03-16 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 31.502826
Lon -94.229586

Well Details

Well Number
2H
Max Depth
19,500 ft
Drill Type
Horizontal
District
6
Completed
2020-01-03

Operator

Location
DENVER
P-5 Status
Active (filed 2025-07-02)
Cum Oil (all leases)
43,892,171 bbl
Cum Gas (all leases)
1,809,356,449 mcf
Activities
CSGD/G, GTHS/G, OPRS/G, OPRS/O
Total Permits
1,547