42-405-30806

PRODUCING Horizontal

MISSISSIPPI GAS UNIT

SAN AUGUSTINE County · District 6 · ADAMAS ENERGY LLC · CARTHAGE (HAYNESVILLE SHALE)

Permits

1

Max Depth

16,000 ft

First Permit

2023-04-10

Latest Activity

2023-04-10

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2024-02-17

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: ADAMAS ENERGY LLC ≠ Permit: AETHON ENERGY OPERATING LLC

Resolved via: productionADAMAS ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2023-07

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (6) Elevation 219 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
AUSTIN CHALK 5,977 ft-5,758 ft
AUSTIN CHALK 6,224 ft-6,005 ft
JAMES LIME 9,100 ft-8,881 ft
JAMES LIME 9,347 ft-9,128 ft
HAYNESVILLE 14,844 ft-14,625 ft
HAYNESVILLE 15,091 ft-14,872 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-405-30807 MISSISSIPPI GAS UNIT · AETHON ENERGY OPERATING LLC
0.0 mi
Austin Chalk 5,377'Austin Chalk 6,224'James Lime 9,100'James Lime 9,347'Haynesville 14,020'Haynesville 14,267'
42-405-30660 MISSISSIPPI GAS UNIT · BP AMERICA PRODUCTION COMPANY
1.5 mi
Austin Chalk 6,374'James Lime 9,144'Haynesville 14,254'
42-405-30731 COLUMBIA UNIT · AETHON ENERGY OPERATING LLC
1.6 mi
James Lime 9,177'Travis Peak 10,488'Cotton Valley 13,200'Haynesville 14,130'Austin Chalk
42-405-30714 CARTER, FLOURNOY · DUAL PRODUCTION PARTNERS, LLC
1.8 mi
Austin Chalk 200'James Lime 600'Haynesville 900'
42-405-30757 ICHABODS GAS UNIT · AETHON ENERGY OPERATING LLC
2.0 mi
James Lime 9,146'Cotton Valley 13,169'Haynesville 14,119'Austin Chalk
42-405-30758 ICHABODS GAS UNIT · AETHON ENERGY OPERATING LLC
2.0 mi
James Lime 9,144'Cotton Valley 13,167'Haynesville 14,117'Austin Chalk
42-405-30866 CONGO UNIT · AETHON ENERGY OPERATING LLC
2.6 mi
Austin Chalk 6,479'James Lime 9,610'Haynesville 14,601'
42-405-30865 CONGO UNIT · AETHON ENERGY OPERATING LLC
2.6 mi
Austin Chalk 5,483'James Lime 9,505'Haynesville 15,376'

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
15,600–23,940 ftPerforated

Casing (4)

SizeSet DepthCement
24"100 ft180 sx
16"3,365 ft3,315 sx
10.75"10,642 ft1,745 sx
5.5"23,963 ft1,735 sx

Permit History (1)

Applications (1)

#889601 A AETHON ENERGY OPERATING LLC
received 2023-04-05

Records & Logs

2 completion filings on record.

W-2/G-1 2024-03-20
W-2/G-1 2023-12-20

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 31.326629
Lon -94.278975

Well Details

Well Number
3H
Max Depth
16,000 ft
Drill Type
Horizontal
District
6
Completed
2024-02-17

Operator

Location
DOVER
P-5 Status
Active (filed 2026-01-06)
Cum Oil (all leases)
15 bbl
Cum Gas (all leases)
80,959,292 mcf
Activities
OPRS/G, OPRS/O
Total Permits
55