42-409-03197

U

MALONE

SAN PATRICIO County · District 4 · MARATHON OIL COMPANY · WHITE POINT EAST

Permits

1

Max Depth

6,800 ft

First Permit

1983-08-01

Latest Activity

1983-08-01

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-10-24

Shut-In

Plugged

1984-06-29

Formation Tops (1) Elevation 66 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
3200 "C" OIL SD3,270 ft-3,204 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
3,153–3,161 ftPerforated
3,270–3,275 ftPerforated

Casing (6)

SizeSet DepthCement
10.75"1,354 ft
10.75"1,368 ft750 sx
5.5"3,416 ft
5.5"3,435 ft400 sx
10.75"
5.5"

Permit History (1)

Applications (1)

#206143 A MARATHON OIL COMPANY
received 1983-06-30

Records & Logs

3 completion filings on record.

W-2/G-1 1983-12-01
W-2/G-1 1983-12-01
W-2/G-1 1955-02-25

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in SAN PATRICIO County.

Well Details

Well Number
2
Max Depth
6,800 ft
Drill Type
Vertical
District
4
Completed
1983-10-24

Operator

Location
HOUSTON
P-5 Status
Active (filed 2025-08-14)
Cum Oil (all leases)
183,150,113 bbl
Cum Gas (all leases)
1,013,063,895 mcf
Activities
CSGD/P, G/PUR
Total Permits
3,707