42-409-03276
Final CompletionSOLAR-FICKE
SAN PATRICIO County · District 4 · AMERICAN SHORELINE INC. · WHITE POINT EAST (2870 SAND)
Permits
2
Max Depth
5,677 ft
First Permit
1983-07-13
Latest Activity
1992-01-21
Lifespan
9 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1992-03-18
Shut-In
—
Plugged
2009-08-21
EWA / Permit operator mismatch
Scheduling: AMERICAN SHORELINE INC. ≠ Permit: MARATHON OIL COMPANY
Resolved via: scheduling → AMERICAN SHORELINE INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2012-12
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4) Elevation 57 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| MIOCENE (Miocene (undifferentiated)) | 1 ft | +56 ft |
| ANAHUAC | 4,450 ft | -4,393 ft |
| 4900' OIL SAND | 4,922 ft | -4,865 ft |
| FRIO | 5,150 ft | -5,093 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 2,871–2,881 ft | Perforated |
| 4,922–4,926 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 1,354 ft | 350 sx |
| 9.625" | 1,354 ft | 350 sx |
| 5.5" | 5,677 ft | 500 sx |
| 5.5" | 5,677 ft | 560 sx |
| 5.5" | 5,677 ft | — |
Permit History (2)
Applications (2)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 3
- Max Depth
- 5,677 ft
- Drill Type
- Vertical
- County
- SAN PATRICIO
- District
- 4
- Operator
- AMERICAN SHORELINE INC.
- Completed
- 1992-03-18
Operator
- Location
- CORPUS CHRI, ST
- P-5 Status
- Active (filed 2026-01-29)
- Cum Oil (all leases)
- 1,130,720 bbl
- Cum Gas (all leases)
- 5,604,615 mcf
- Activities
- OPRS/O
- Total Permits
- 153