42-409-31345

Final Completion

BERRY B

SAN PATRICIO County · District 4 · CHAPMAN ENERGY INC. · BERRY (6100-E)

Permits

1

Max Depth

6,400 ft

First Permit

1979-07-20

Latest Activity

1979-07-20

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-09-12

Shut-In

Plugged

1987-09-02

!

EWA / Permit operator mismatch

Scheduling: CHAPMAN ENERGY INC. ≠ Permit: TARTAN PRODUCTION CO.

Resolved via: schedulingCHAPMAN ENERGY INC.

Operator History

originally filed by TARTAN PRODUCTION CO. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
6,114–6,116 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"994 ft650 sx
2.375"6,047 ft
4.5"6,300 ft220 sx

Permit History (1)

Applications (1)

#53358 A TARTAN PRODUCTION CO.
received 1979-07-20

Records & Logs

1 completion filing on record.

W-2/G-1 1979-10-01

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in SAN PATRICIO County.

Well Details

Well Number
3
Max Depth
6,400 ft
Drill Type
Vertical
District
4
Completed
1979-09-12

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1989-08-30)
Total Permits
24