42-409-32768

Final Completion

SVADLENAK

SAN PATRICIO County · District 4 · AMERICAN SHORELINE INC. · WHITE POINT E (WHITE PT.2500 N)

Permits

1

Max Depth

3,100 ft

First Permit

2004-08-31

Latest Activity

2004-08-31

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2005-01-07

Shut-In

Plugged

2006-11-21

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2005-01

Last Production

2006-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 54 ft

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
2500' SAND2,462 ft-2,408 ft
OAKVILLE 3,050 ft-2,996 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,468–2,474 ftPerforated

Casing (2)

SizeSet DepthCement
7.625"517 ft132 sx
2.875"3,060 ft480 sx

Permit History (1)

Applications (1)

#550196 A AMERICAN SHORELINE, INC.
received 2004-08-27

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2005-01-25 log on file
W-2/G-1 2005-03-07

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in SAN PATRICIO County.

Well Details

Well Number
2
Max Depth
3,100 ft
Drill Type
Vertical
District
4
Completed
2005-01-07

Operator

Location
CORPUS CHRI, ST
P-5 Status
Active (filed 2026-01-29)
Cum Oil (all leases)
1,130,720 bbl
Cum Gas (all leases)
5,604,615 mcf
Activities
OPRS/O
Total Permits
153