42-413-31384

Final Completion

POWELL

SCHLEICHER County · District 7 · CARAWAY OPERATING CO. · CAMAR SW. (STRAWN 4350)

Permits

1

Max Depth

5,200 ft

First Permit

1984-02-10

Latest Activity

1984-02-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-03-09

Shut-In

Plugged

1998-02-05

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (4) Elevation 2,284 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
PALO PINTO 3,828 ft-1,544 ft
HARKEY SAND3,948 ft-1,664 ft
CAMAR4,348 ft-2,064 ft
STRAWN LIME (Strawn)4,426 ft-2,142 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
4,356–4,364 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"546 ft350 sx
4.5"4,452 ft175 sx

Permit History (1)

Applications (1)

#229080 A CARAWAY OPERATING CO.
received 1984-02-08

Records & Logs

1 completion filing on record.

W-2/G-1 1984-03-22
Completion packets + logs ↗ Wellbore filings ↗

Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in SCHLEICHER County.

Well Details

Well Number
3030
Max Depth
5,200 ft
Drill Type
Vertical
County
SCHLEICHER
District
7
Completed
1984-03-09

Operator

Location
SAN ANGELO
P-5 Status
Active (filed 2026-01-21)
Cum Oil (all leases)
575,864 bbl
Cum Gas (all leases)
601,034 mcf
Activities
OPRS/O
Total Permits
143