42-417-38328
Final CompletionBURLESON 34
SHACKELFORD County · District 7 · VAN OPERATING LTD. · WILDCAT
Permits
1
Max Depth
1,000 ft
First Permit
2001-06-12
Latest Activity
2001-06-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2002-02-04
Shut-In
—
Plugged
2014-03-01
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2002-02
Last Production
2014-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 1,480 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| T/CAMP COLORADO | 651 ft | +829 ft |
| T/STOCKWETHER | 761 ft | +719 ft |
| T/SADDLE CREEK | 857 ft | +623 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 917–921 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 7" | 853 ft | 170 sx |
| 4.5" | 947 ft | 75 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 3
- Max Depth
- 1,000 ft
- Drill Type
- Vertical
- County
- SHACKELFORD
- District
- 7
- Operator
- VAN OPERATING LTD.
- Completed
- 2002-02-04
Operator
- Name
- VAN OPER, LTD
- Location
- ALBANY
- P-5 Status
- Inactive (filed 2021-01-28)
- Cum Oil (all leases)
- 2,622,871 bbl
- Cum Gas (all leases)
- 17,933,747 mcf
- Total Permits
- 96