Permits
4
Max Depth
7,000 ft
First Permit
2006-02-10
Latest Activity
2008-11-07
Lifespan
3 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2006-09
Last Production
2026-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 246 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| SARATOGA CHALK | 2,071 ft | -1,825 ft |
| ANNONA | 2,324 ft | -2,078 ft |
| AUSTIN CHALK | 3,006 ft | -2,760 ft |
| FREDERICKSBURG | 3,458 ft | -3,212 ft |
| MORRINGSPRIT | 4,757 ft | -4,511 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 6,741–13,413 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 1,247 ft | 340 sx |
| 7" | 6,741 ft | 660 sx |
Permit History (4)
Applications (4)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1H
- Max Depth
- 7,000 ft
- Drill Type
- Horizontal
- County
- SHELBY
- District
- 6
- Operator
- ELLORA OPERATING, L.P.
Operator
- Name
- ELLORA OPER, L.P
- Location
- FORT WORTH
- P-5 Status
- Delinquent (filed 2010-06-17)
- Cum Oil (all leases)
- 117,013 bbl
- Cum Gas (all leases)
- 57,198,828 mcf
- Total Permits
- 167