42-419-31467

PRODUCING Horizontal

HARRIS MARY

SHELBY County · District 6 · ADAMAS ENERGY LLC · CARTHAGE (HAYNESVILLE SHALE)

RRC Lookup

Permits

4

Max Depth

15,000 ft

First Permit

2009-05-15

Latest Activity

2009-05-22

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2009-12-16

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: ADAMAS ENERGY LLC ≠ Production: AETHON ENERGY OPERATING LLC (reported 2025-11)

!

EWA / Permit operator mismatch

Scheduling: ADAMAS ENERGY LLC ≠ Permit: PETROHAWK OPERATING COMPANY

Resolved via: productionAETHON ENERGY OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2009-09

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#681287 A NOBLE ENERGY INC
received 2009-09-09
#681287 A PETROHAWK OPERATING COMPANY
received 2009-07-23
#681287 A PETROHAWK OPERATING COMPANY
received 2009-05-22
#681287 A NOBLE ENERGY INC
received 2009-05-14

Well Details

Well Number
1H
Max Depth
15,000 ft
Drill Type
Horizontal
County
SHELBY
District
6
Completed
2009-12-16

Operator

Location
DOVER
P-5 Status
Y (filed 2026-01-06)
Activities
OPRS/G
Total Permits
24

External Links

Live © 2026 Petrora