42-421-30679
Final CompletionARCHER A
SHERMAN County · District 10 · PHILLIPS PETROLEUM COMPANY · PALO DURO CREEK (RED CAVE)
Permits
1
Max Depth
2,225 ft
First Permit
1998-01-28
Latest Activity
1998-01-28
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1998-03-26
Shut-In
—
Plugged
2000-03-01
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1998-03
Last Production
2000-02
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2) Elevation 3,410 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| BASE STONE CORRAL | 1,701 ft | +1,709 ft |
| RED CAVE | 1,879 ft | +1,531 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 1,990–2,150 ft | Open hole |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 499 ft | 265 sx |
| 7" | 1,990 ft | 135 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 2,225 ft
- Drill Type
- Vertical
- County
- SHERMAN
- District
- 10
- Operator
- PHILLIPS PETROLEUM COMPANY
- Completed
- 1998-03-26
Operator
- Name
- PHILLIPS PETRO CO
- Location
- HOUSTON
- P-5 Status
- Inactive (filed 2002-07-30)
- Cum Oil (all leases)
- 41,085,875 bbl
- Cum Gas (all leases)
- 1,158,849,972 mcf
- Total Permits
- 2,544