42-423-30213

Final Completion

MOLLIE WOOLF GAS UNIT

SMITH County · District 6 · AMERICAN PETROFINA CO. OF TEX. · OVERTON (HAYNESVILLE)

RRC Lookup

Permits

1

Max Depth

12,320 ft

First Permit

2013-10-10

Latest Activity

2013-10-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: AMERICAN PETROFINA CO. OF TEX. ≠ Production: FAULCONER ENERGY, LLC (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: AMERICAN PETROFINA CO. OF TEX. ≠ Permit: LINN OPERATING, INC.

Resolved via: productionFAULCONER ENERGY, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#768642 A LINN OPERATING, INC.
received 2013-08-20

Well Details

Well Number
1
Max Depth
12,320 ft
Drill Type
Vertical
County
SMITH
District
6

Operator

Location
DALLAS
P-5 Status
Y (filed 1985-11-15)
Total Permits
831

External Links

Live © 2026 Petrora