42-423-30610

Final Completion

DICKERSON W.J.

SMITH County · District 6 · ALTAIR ENERGY CORP. · CHAPEL HILL (TRAVIS PEAK)

Permits

1

Max Depth

8,900 ft

First Permit

1982-08-05

Latest Activity

1982-08-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-11-19

Shut-In

Plugged

1989-01-16

!

EWA / Permit operator mismatch

Scheduling: ALTAIR ENERGY CORP. ≠ Permit: CLEMCO

Resolved via: schedulingALTAIR ENERGY CORP.

Operator History

originally filed by CLEMCO — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
8,263–8,466 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"1,200 ft545 sx
2.375"8,194 ft
4.5"8,501 ft1,370 sx

Permit History (1)

Applications (1)

#168756 A CLEMCO
received 1982-08-05

Records & Logs

1 completion filing on record.

W-2/G-1 1982-12-20

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in SMITH County.

Well Details

Well Number
1
Max Depth
8,900 ft
Drill Type
Vertical
County
SMITH
District
6
Completed
1982-11-19

Operator

Location
TYLER
P-5 Status
Inactive (filed 1994-01-04)
Cum Oil (all leases)
38,686 bbl
Cum Gas (all leases)
455,828 mcf
Total Permits
27