42-423-30725

Final Completion

WALTON DAVIS

SMITH County · District 6 · ELAND ENERGY INC. · CHAPEL HILL NE. (TRAVIS PEAK)

Permits

1

Max Depth

8,700 ft

First Permit

1983-09-08

Latest Activity

1983-09-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-12-02

Shut-In

Plugged

1990-10-15

!

EWA / Permit operator mismatch

Scheduling: ELAND ENERGY INC. ≠ Permit: CIBOLA OIL & GAS CORP.

Resolved via: schedulingELAND ENERGY INC.

Operator History

originally filed by CIBOLA OIL & GAS CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 414 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
BASED /MASSIVE ANHYDRITE7,428 ft-7,014 ft
TOP/TRAVIS PEAK (Travis Peak)8,265 ft-7,851 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (3)

IntervalType
8,296–8,311 ftPerforated
8,446–8,456 ftPerforated
8,487–8,489 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"1,200 ft550 sx
4.5"8,650 ft520 sx

Permit History (1)

Applications (1)

#210461 A CIBOLA OIL & GAS CORP.
received 1983-12-07

Records & Logs

1 completion filing on record.

W-2/G-1 1983-12-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in SMITH County.

Well Details

Well Number
1
Max Depth
8,700 ft
Drill Type
Vertical
County
SMITH
District
6
Completed
1983-12-02

Operator

Location
DALLAS
P-5 Status
Inactive (filed 2021-02-04)
Cum Oil (all leases)
2,811,241 bbl
Cum Gas (all leases)
24,710,183 mcf
Total Permits
55