42-423-30761
Final CompletionHOLLAND HEIRS
SMITH County · District 6 · ALTAIR ENERGY CORP. · CHAPEL HILL NE. (TRAVIS PEAK)
Permits
2
Max Depth
8,800 ft
First Permit
1983-12-27
Latest Activity
1989-09-14
Lifespan
6 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-04-18
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: ALTAIR ENERGY CORP. ≠ Production: ATLANTIS OIL COMPANY, INC. (reported 2025-12)
Resolved via: production → ATLANTIS OIL COMPANY, INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#363806 A ALTAIR ENERGY CORP.
received 1989-09-11
#224713 A CLEMCO
received 1983-12-27
Well Details
- Well Number
- 1
- Max Depth
- 8,800 ft
- Drill Type
- Vertical
- County
- SMITH
- District
- 6
- Operator
- ALTAIR ENERGY CORP.
- Completed
- 1984-04-18
Operator
- Name
- ALTAIR ENGY CORP
- Location
- TYLER
- P-5 Status
- Y (filed 1994-11-04)
- Cum Oil (all leases)
- 38,686 bbl
- Cum Gas (all leases)
- 455,828 mcf
- Total Permits
- 27