42-423-31522
Final CompletionWILSON P.M. HEIRS
SMITH County · District 6 · LINN OPERATING INC. · OVERTON (COTTON VALLEY SAND)
Permits
2
Max Depth
13,000 ft
First Permit
1999-06-21
Latest Activity
2013-05-21
Lifespan
14 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1999-09-07
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: LINN OPERATING INC. ≠ Production: FAULCONER ENERGY, LLC (reported 2025-12)
Resolved via: production → FAULCONER ENERGY, LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1999-09
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#762926 A LINN OPERATING, INC.
received 2013-05-17
#484384 A FINA OIL & CHEMICAL COMPANY
received 1999-05-07
Well Details
- Well Number
- 1
- Max Depth
- 13,000 ft
- Drill Type
- Vertical
- County
- SMITH
- District
- 6
- Operator
- LINN OPERATING INC.
- Completed
- 1999-09-07
Operator
- Name
- LINN OPER, INC
- Location
- HOUSTON
- P-5 Status
- Y (filed 2019-03-08)
- Cum Oil (all leases)
- 29,555,839 bbl
- Cum Gas (all leases)
- 478,103,312 mcf
- Total Permits
- 1,401