42-423-31872

Final Completion Directional

SHIELS

SMITH County · District 6 · BARROW-SHAVER RESOURCES CO. · HAWKINS SOUTH (RODESSA)

Permits

1

Max Depth

10,000 ft

First Permit

2004-12-21

Latest Activity

2004-12-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2005-04-02

Shut-In

Plugged

2011-06-14

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2005-05

Last Production

2012-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (5) Elevation 327 ft (DF)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
BUDA 6,060 ft-5,733 ft
PALUXY 7,313 ft-6,986 ft
GLENROSE (Glen Rose)7,710 ft-7,383 ft
TMA9,120 ft-8,793 ft
BMA 9,500 ft-9,173 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
9,639–9,652 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"4,754 ft1,295 sx
5.5"9,950 ft1,630 sx

Permit History (1)

Applications (1)

#553964 A BARROW-SHAVER RESOURCES CO.
received 2004-11-22

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2005-06-20 log on file
W-2/G-1 2005-11-30

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in SMITH County.

Well Details

Well Number
1
Max Depth
10,000 ft
Drill Type
Directional
County
SMITH
District
6
Completed
2005-04-02

Operator

Location
TYLER
P-5 Status
X (filed 2026-04-02)
Cum Oil (all leases)
5,818,433 bbl
Cum Gas (all leases)
25,993,938 mcf
Activities
OPRS/G, OPRS/O
Total Permits
201