42-427-04715

Final Completion

GARCIA JOSE G.

STARR County · District 4 · CABOT PETROLEUM CORPORATION · JAY SIMMONS (8000)

RRC Lookup

Permits

1

Max Depth

8,150 ft

First Permit

1988-08-03

Latest Activity

1988-08-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: CABOT PETROLEUM CORPORATION ≠ Production: WAGNER OIL COMPANY (reported 2015-06)

Resolved via: schedulingCABOT PETROLEUM CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#349622 A CABOT PETROLEUM CORPORATION
received 1988-08-01

Well Details

Well Number
A8
Max Depth
8,150 ft
Drill Type
Vertical
County
STARR
District
4

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 1991-08-15)
Total Permits
118

External Links

Live © 2026 Petrora