42-429-33241

VEALE-PARKS

STEPHENS County · District 7 · ELAND ENERGY, INC.

Permits

2

Max Depth

3,500 ft

First Permit

1982-04-20

Latest Activity

1995-04-03

Lifespan

13 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,238–3,273 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"210 ft175 sx
2.375"3,290 ft
5.5"3,416 ft400 sx

Permit History (2)

Applications (2)

#433715 A ELAND ENERGY, INC.
received 1995-03-13
#157440 A SUN EXPL. & PROD. CO.-ABILENE
received 1982-04-20

Records & Logs

1 completion filing on record.

W-2/G-1 1982-07-21

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in STEPHENS County.

Well Details

Well Number
13
Max Depth
3,500 ft
Drill Type
Vertical
County
STEPHENS
District
7

Operator

Location
DALLAS
P-5 Status
Inactive (filed 2021-02-04)
Cum Oil (all leases)
2,811,241 bbl
Cum Gas (all leases)
24,710,183 mcf
Total Permits
55