42-429-33521

Final Completion

HARBISON

STEPHENS County · District 7 · LECLAIR OPERATING CO. INC. · BOWAR SW. (CADDO)

Permits

1

Max Depth

4,546 ft

First Permit

1982-11-29

Latest Activity

1982-11-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-02-16

Shut-In

Plugged

1987-08-29

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,638–3,642 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"110 ft80 sx
2.375"3,678 ft
4.5"3,749 ft250 sx

Permit History (1)

Applications (1)

#178362 A LECLAIR OPERATING CO., INC.
received 1982-11-29

Records & Logs

1 completion filing on record.

W-2/G-1 1983-03-16

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in STEPHENS County.

Well Details

Well Number
2
Max Depth
4,546 ft
Drill Type
Vertical
County
STEPHENS
District
7
Completed
1983-02-16

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2013-06-05)
Cum Oil (all leases)
1,674,817 bbl
Cum Gas (all leases)
8,238,505 mcf
Total Permits
351