42-429-33927
Final CompletionSINGLETON HEIRS
STEPHENS County · District 7 · FOAG INC. · STEPHENS COUNTY REGULAR
Permits
1
Max Depth
4,200 ft
First Permit
1983-11-21
Latest Activity
1983-11-21
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1993-04-28
Shut-In
—
Plugged
2010-09-22
EWA / Permit operator mismatch
Scheduling: FOAG INC. ≠ Permit: MILLER, BOB I.
Resolved via: scheduling → FOAG INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
300 bbl/d
Max Pressure
1,350 psi
Injection Interval
2,772–2,874 ft
Injected (12mo)
—
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4)
CSV| Formation | Top Depth (MD) |
|---|---|
| PALO PINTO LIME (Palo Pinto) | 2,704 ft |
| CADDO | 3,468 ft |
| MISSISSIPPI (Mississippian) | 4,064 ft |
| ELLENBURGER | 4,244 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 2,847–2,860 ft | Perforated |
| 4,113–4,139 ft | Perforated |
| 4,184–4,274 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 114 ft | 70 sx |
| — | 2,910 ft | 100 sx |
| 4.5" | 4,184 ft | 125 sx |
Permit History (1)
Applications (2)
Records & Logs
7 completion filings on record.
+1 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet