42-431-30963

Final Completion

ELEANOR HOPPE

STERLING County · District 8 · STELLER ENERGY & INVESTMENT CORP

Permits

2

Max Depth

9,300 ft

First Permit

1981-03-20

Latest Activity

2009-12-21

Lifespan

29 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1981-05-01

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2009-07

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3) Elevation 2,680 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION 4,317 ft-1,637 ft
UPPER WOLFCAMP (Wolfcamp)5,569 ft-2,889 ft
CISCO MARKER (Cisco)7,515 ft-4,835 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
5,780–7,182 ftPerforated

Casing (3)

SizeSet DepthCement
13.375"350 ft
8.625"2,000 ft
5.5"7,586 ft485 sx

Permit History (2)

Applications (2)

#688680 A STELLER ENERGY & INVESTMENT CORP
received 2009-12-15
#112714 A FOREST OIL CORP.
received 1981-03-20

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2010-06-23 log on file
W-2/G-1 2010-10-19

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in STERLING County.

Well Details

Well Number
2
Max Depth
9,300 ft
Drill Type
Vertical
County
STERLING
District
8

Operator

Location
PLANO
P-5 Status
Inactive (filed 2020-02-11)
Cum Oil (all leases)
2,269,020 bbl
Cum Gas (all leases)
1,726,911 mcf
Total Permits
160