Permits
2
Max Depth
1,650 ft
First Permit
1982-09-07
Latest Activity
1982-09-15
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
500 bbl/d
Max Pressure
700 psi
Injection Interval
1,006–1,050 ft
Injected (12mo)
—
Monthly injected volume (bbl, from H-10 filings through 2026-01-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 2,518 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| QUEEN | 1,006 ft | +1,512 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (5)
| Interval | Type |
|---|---|
| 1,006–1,022 ft | Perforated |
| 1,022–1,066 ft | Perforated |
| 1,026–1,031 ft | Perforated |
| 1,038–1,050 ft | Perforated |
| 1,050–1,099 ft | Open hole |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 325 ft | 210 sx |
| 2.375" | 961 ft | — |
| 4.5" | 1,052 ft | 290 sx |
Permit History (2)
Applications (2)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- Q1
- Max Depth
- 1,650 ft
- Drill Type
- Vertical
- County
- STERLING
- District
- 8
- Operator
- HRUBETZ OIL COMPANY
Operator
- Location
- DALLAS
- P-5 Status
- Inactive (filed 1997-11-18)
- Total Permits
- 304