42-441-20235

Final Completion

PERINI

TAYLOR County · District 7 · HARKEN PRODUCTION CO. · LAKE ABILENE (4000)

Permits

1

Max Depth

4,100 ft

First Permit

1982-01-26

Latest Activity

1982-01-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-03-04

Shut-In

Plugged

1988-08-04

!

EWA / Permit operator mismatch

Scheduling: HARKEN PRODUCTION CO. ≠ Permit: FISHER-WEBB, INC.

Resolved via: schedulingHARKEN PRODUCTION CO.

Injection / Disposal

H-1 Injection Plugged 2005-05-06 UIC #000081915 permitted 1994-12-30

Permitted Volume

500 bbl/d

Max Pressure

600 psi

Injection Interval

2,376–2,392 ft

Injected (12mo)

Operator History

originally filed by FISHER-WEBB, INC. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,915–3,922 ftPerforated

Casing (3)

SizeSet DepthCement
9.625"106 ft100 sx
2.375"3,885 ft
4.5"3,999 ft200 sx

Permit History (1)

Applications (1)

#148592 A FISHER-WEBB, INC.
received 1982-01-26

Records & Logs

1 completion filing on record.

W-2/G-1 1982-03-08

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in TAYLOR County.

Well Details

Well Number
1
Max Depth
4,100 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1982-03-04

Operator

Location
MIDLAND
P-5 Status
Inactive (filed 1990-06-07)
Total Permits
14