42-441-33512

Final Completion

MOORE H. J.

TAYLOR County · District 7 · SMITH PIPE OF ABILENE · TAYLOR COUNTY REGULAR

Permits

1

Max Depth

3,000 ft

First Permit

1991-07-17

Latest Activity

1991-07-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-08-21

Shut-In

Plugged

2004-03-08

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WEST INLAND ENERGY, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 2,147 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
SADDLE CREEK LIMESTONE (Saddle Creek)2,927 ft-780 ft
FLIPPEN SANDSTONE2,964 ft-817 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,965–2,967 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"164 ft100 sx
4.5"2,985 ft320 sx

Permit History (1)

Applications (1)

#389948 A WEST INLAND ENERGY, INC.
received 1991-07-16

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1991-09-19 log on file
W-2/G-1 1991-09-27

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in TAYLOR County.

Well Details

Well Number
2
Max Depth
3,000 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1991-08-21

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2014-08-29)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf