42-441-33711

Final Completion

CHILDERS

TAYLOR County · District 7 · AZTEX PETROLEUM · EL CABALLO BLANCO (FLIPPEN)

Permits

1

Max Depth

2,500 ft

First Permit

1994-11-28

Latest Activity

1994-11-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-01-02

Shut-In

Plugged

2013-09-06

!

EWA / Permit operator mismatch

Scheduling: AZTEX PETROLEUM ≠ Permit: NEAL, JACK ENGINEERING, INC.

Resolved via: schedulingAZTEX PETROLEUM

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 1,975 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
SADDLE CREEK 2,279 ft-304 ft
COAL2,301 ft-326 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,305–2,309 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"110 ft60 sx
4.5"2,305 ft100 sx

Permit History (1)

Applications (1)

#430055 A NEAL, JACK ENGINEERING, INC.
received 1994-11-15

Records & Logs

2 completion filings on record.

W-2/G-1 1995-01-17
W-2/G-1 1995-01-25

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in TAYLOR County.

Well Details

Well Number
1
Max Depth
2,500 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1995-01-02

Operator

Location
CHANDLER
P-5 Status
Inactive (filed 2014-04-02)
Cum Oil (all leases)
6,004 bbl
Cum Gas (all leases)
13 mcf