42-441-34698

Final Completion

WRIGHT

TAYLOR County · District 7 · L.C.S. PRODUCTION COMPANY · KISSELL (FRY UPPER)

Permits

1

Max Depth

4,999 ft

First Permit

2024-06-03

Latest Activity

2024-06-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2024-07-30

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2020-08

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 2,200 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION - CORROSIVE, SW (Coleman Junction)2,095 ft+105 ft
SADDLE CREEK - DISPOSAL (Saddle Creek)2,912 ft-712 ft
FLIPPEN - DISPOSAL3,005 ft-805 ft
KING SAND - DISPOSAL3,330 ft-1,130 ft
PALO PINTO LIME - DISPOSAL (Palo Pinto)3,917 ft-1,717 ft
CISCO - DISPOSAL (Cisco)
COOK - DISPOSAL
HOPE LIME - DISPOSAL
SWASTIKA - DISPOSAL
UNIDENTIFIED-COUNTY REGULAR - DI

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-441-34703 KISSELL · L.C.S. PRODUCTION COMPANY
0.2 mi
Coleman Junction 2,114'Saddle Creek 2,933'FLIPPEN - DISPOSAL 3,038'HOPE LIME - DISPOSAL 3,229'KING SAND - DISPOSAL 3,356'Palo Pinto 3,936'SWASTIKA - DISPOSAL UNIDENTIFIED-COUNTY REGULAR - DI COOK - DISPOSAL Cisco
42-441-34702 CASEY · L.C.S. PRODUCTION COMPANY
0.3 mi
Coleman Junction 2,090'Saddle Creek 2,902'FLIPPEN - DISPOSAL 3,008'KING SAND - DISPOSAL 3,338'Palo Pinto 3,904'UNIDENTIFIED-COUNTY REGULAR - DI Cisco COOK - DISPOSAL HOPE LIME - DISPOSAL SWASTIKA - DISPOSAL
42-441-34706 KISSELL · L.C.S. PRODUCTION COMPANY
0.3 mi
Coleman Junction 2,102'Coleman Junction 2,105'Saddle Creek 3,020'FLIPPEN - DISPOSAL 3,023'KING SAND - DISPOSAL 3,304'Palo Pinto 3,919'FRY SAND 4,664'SWASTIKA - DISPOSAL HOPE LIME - DISPOSAL COOK - DISPOSAL Cisco UNIDENTIFIED-COUNTY REGULAR - DI
42-441-34620 KISSELL · ECHO PRODUCTION, INC.
0.3 mi
Coleman Junction 2,090'FLIPPEN - DISPOSAL 3,050'COOK - DISPOSAL HOPE LIME - DISPOSAL KING SAND - DISPOSAL SWASTIKA - DISPOSAL Saddle Creek Cisco Palo Pinto UNIDENTIFIED-COUNTY REGULAR - DI
42-441-02605 KISSELL · L.C.S. PRODUCTION COMPANY
0.3 mi
UNIDENTIFIED-COUNTY REGULAR - DI COOK - DISPOSAL HOPE LIME - DISPOSAL KING SAND - DISPOSAL SWASTIKA - DISPOSAL HOPE SAND - DISPOSAL Canyon Saddle Creek Cisco Palo Pinto
42-441-34696 KISSELL · L.C.S. PRODUCTION COMPANY
0.5 mi
Coleman Junction 2,122'Saddle Creek 2,943'FLIPPEN - DISPOSAL 3,039'KING SAND - DISPOSAL 3,364'FRY SAND 4,707'SWASTIKA - DISPOSAL UNIDENTIFIED-COUNTY REGULAR - DI Cisco COOK - DISPOSAL HOPE LIME - DISPOSAL
42-441-31504 SIMS · CEDAR OIL COMPANY
2.9 mi
Coleman Junction 2,082'Saddle Creek 2,972'FLIPPEN - DISPOSAL 3,010'HOPE LIME - DISPOSAL 3,140'Palo Pinto 3,885'CAPPS LIME 4,652'FRY SD 4,682'GARDNER LIME 5,118'GRAY SD 5,292'SWASTIKA - DISPOSAL COOK - DISPOSAL Cisco +2 more
42-441-34405 ALEX SEARS '159' · CEDAR OIL COMPANY
3.0 mi
REEF 3,894'Canyon 3,894'CAPPS 4,650'GARDNER SAND 5,200'

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
4,659–4,684 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"224 ft145 sx
4.5"4,850 ft325 sx

Permit History (1)

Applications (1)

#900126 A L.C.S. PRODUCTION COMPANY
received 2024-05-31

Records & Logs

2 completion filings on record · 2 with log images at RRC.

W-2/G-1 2024-10-24 log on file
W-2/G-1 2024-10-24 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 32.169894
Lon -100.085160

Well Details

Well Number
3
Max Depth
4,999 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
2024-07-30

Operator

Location
ABILENE
P-5 Status
Active (filed 2025-07-08)
Cum Oil (all leases)
7,065,175 bbl
Cum Gas (all leases)
3,085,370 mcf
Activities
OPRS/G, OPRS/O
Total Permits
1,696