42-451-31936

Final Completion

RUNION LEWIS

TOM GREEN County · District 7 · CLEERE OPERATING COMPANY · TINY TIM (PALO PINTO)

Permits

2

Max Depth

6,800 ft

First Permit

1989-02-22

Latest Activity

1989-02-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-04-03

Shut-In

Plugged

1990-12-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (4) Elevation 2,054 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION 2,315 ft-261 ft
PALO PINTO 5,295 ft-3,241 ft
CROSS CUT5,465 ft-3,411 ft
STRAWN 6,030 ft-3,976 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
5,376–5,381 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"784 ft295 sx
4.5"5,650 ft280 sx

Permit History (2)

Applications (2)

#356285 A CLEERE OPERATING COMPANY
received 1989-03-20
#356285 A WEST BAY EXPLORATION COMPANY
received 1989-02-22

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1989-04-24 log on file
W-2/G-1 1989-05-09

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in TOM GREEN County.

Well Details

Well Number
1
Max Depth
6,800 ft
Drill Type
Vertical
County
TOM GREEN
District
7
Completed
1989-04-03

Operator

Location
SAN ANGELO
P-5 Status
Inactive (filed 2001-08-07)
Total Permits
36