42-457-00109

Final Completion

KIRBY LUMBER CORP TRACT 87-A

TYLER County · District 3 · ENCORE ENERGY INC. · HILLISTER EAST (YEGUA 2-B)

RRC Lookup

Permits

2

Max Depth

5,500 ft

First Permit

1994-02-24

Latest Activity

2006-02-02

Lifespan

12 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

2000-10-23

!

EWA / Production operator mismatch

Scheduling: ENCORE ENERGY INC. ≠ Production: NECHES TRANSPORT INC. (reported 2025-12)

Resolved via: productionNECHES TRANSPORT INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#613360 A ENCORE ENERGY, INC.
received 2006-01-31
#420095 A ENCORE ENERGY, INC.
received 1994-01-12

Well Details

Well Number
4
Max Depth
5,500 ft
Drill Type
Vertical
County
TYLER
District
3

Operator

Location
GAINESVILLE
P-5 Status
Y (filed 2015-09-11)
Cum Oil (all leases)
363,967 bbl
Cum Gas (all leases)
90,119 mcf
Total Permits
24

External Links

Live © 2026 Petrora