42-461-32439
Final CompletionHAPPLE-THREE
UPTON County · District 7 · WAGNER & BROWN · HIGHLINE ROOST (FUSSELMAN)
Permits
2
Max Depth
12,500 ft
First Permit
1985-07-09
Latest Activity
1989-03-06
Lifespan
4 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-09-01
Shut-In
—
Plugged
1991-10-31
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 2,712 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| BASE OF CRETACEOUS (Base Cretaceous (marker)) | 442 ft | +2,270 ft |
| STRAWN | 9,251 ft | -6,539 ft |
| DEVONIAN | 10,187 ft | -7,475 ft |
| FUSSELMAN | 10,842 ft | -8,130 ft |
| ELLENBURGER | 11,394 ft | -8,682 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 10,381–10,499 ft | Perforated |
| 10,853–10,878 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 470 ft | 525 sx |
| 8.625" | 5,005 ft | 2,500 sx |
| 5.5" | 11,520 ft | 1,390 sx |
Permit History (2)
Applications (2)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 252
- Max Depth
- 12,500 ft
- Drill Type
- Vertical
- County
- UPTON
- District
- 7
- Operator
- WAGNER & BROWN
- Completed
- 1985-09-01
Operator
- Name
- WAGNER & BROWN
- Location
- MIDLAND
- P-5 Status
- Inactive (filed 1992-12-03)
- Total Permits
- 583