Permits
1
Max Depth
5,746 ft
First Permit
2005-11-02
Latest Activity
2005-11-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
4,000 bbl/d
Max Pressure
1,500 psi
Injection Interval
4,945–5,060 ft
Injected (12mo)
25,988 bbl
Monthly injected volume (bbl, from H-10 filings through 2025-08-01)
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4) Elevation 62 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| CATAHOULA | 3,964 ft | -3,902 ft |
| MARGINULINA | 4,715 ft | -4,653 ft |
| FRIO | 5,220 ft | -5,158 ft |
| 5500 A | 5,522 ft | -5,460 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (6)
| Interval | Type |
|---|---|
| 4,418–4,428 ft | Perforated |
| 4,746–4,761 ft | Perforated |
| 5,004–5,066 ft | Perforated |
| 5,422–5,428 ft | Perforated |
| 5,522–5,527 ft | Perforated |
| 5,595–5,604 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 902 ft | 300 sx |
| 9.625" | 1,005 ft | — |
| 7" | 5,743 ft | 350 sx |
| 5.5" | 6,045 ft | 400 sx |
Permit History (1)
Applications (1)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet