42-475-34769

Final Completion

STATE OF TEXAS DF

WARD County · District 8 · APACHE CORPORATION · CAPRITO (DELAWARE MIDDLE)

RRC Lookup

Permits

1

Max Depth

7,000 ft

First Permit

2002-12-06

Latest Activity

2002-12-06

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2003-01-21

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: APACHE CORPORATION ≠ Production: FORGE ENERGY OPERATING, LLC (reported 2021-11)

Resolved via: schedulingAPACHE CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#526121 A APACHE CORPORATION
received 2002-12-06

Well Details

Well Number
6
Max Depth
7,000 ft
Drill Type
Vertical
County
WARD
District
8
Completed
2003-01-21

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
601,175,354 bbl
Cum Gas (all leases)
2,651,268,338 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,576

External Links

Live © 2026 Petrora