42-479-34330

Final Completion

LAUREL ALONZO Z. LTD.

WEBB County · District 4 · EP OPERATING COMPANY · EL MILAGRO (7TH HINNANT)

Permits

1

Max Depth

11,200 ft

First Permit

1986-01-30

Latest Activity

1986-01-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-05-08

Shut-In

Plugged

1988-06-15

Formation Tops (4) Elevation 861 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
3RD HINNANT8,730 ft-7,869 ft
4TH HINNANT9,520 ft-8,659 ft
5TH HINNANT10,000 ft-9,139 ft
7TH HINNANT10,670 ft-9,809 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (3)

IntervalType
10,670–10,679 ftPerforated
10,721–10,724 ftPerforated
10,754–10,764 ftPerforated

Casing (3)

SizeSet DepthCement
10.75"1,542 ft765 sx
9.875"8,904 ft440 sx
4.5"10,948 ft430 sx

Permit History (1)

Applications (2)

#296780 A EP OPERATING COMPANY
received 1986-02-06
#296780 A EP OPERATING COMPANY
received 1986-01-29

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1986-07-24 log on file
W-2/G-1 1986-08-07

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WEBB County.

Well Details

Well Number
2
Max Depth
11,200 ft
Drill Type
Vertical
County
WEBB
District
4
Completed
1986-05-08

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1992-03-26)
Total Permits
568