42-479-42099

WEST COLE FIELD UNIT

WEBB County · District 4 · EARTHSTONE ENERGY,INC.

Permits

1

Max Depth

2,450 ft

First Permit

2012-10-10

Latest Activity

2012-10-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Injection / Disposal

H-1 Injection Cancelled 2016-05-02 UIC #000106903 permitted 2013-03-13

Permitted Volume

1,000 bbl/d

Max Pressure

100 psi

Injection Interval

2,355–2,386 ft

Injected (12mo)

Monthly injected volume (bbl, from H-10 filings through 2015-10-01)

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Permit History (1)

Applications (1)

#748638 A EARTHSTONE ENERGY,INC.
received 2012-09-20

Records & Logs

No W-2/G-1 filings on record in the RRC wellbore file for this well.

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WEBB County.

Well Details

Well Number
1I
Max Depth
2,450 ft
Drill Type
Vertical
County
WEBB
District
4

Operator

Location
THE WOODLAN, DS
P-5 Status
Inactive (filed 2017-02-07)
Cum Oil (all leases)
142,921 bbl
Cum Gas (all leases)
12,833 mcf
Total Permits
5