42-481-32274

Final Completion

JEFFERSON UNIT

WHARTON County · District 3 · LA. CAMPBELL ENERGY CORP. · SPANISH CAMP (FRIO 4840)

Permits

2

Max Depth

5,500 ft

First Permit

1981-11-24

Latest Activity

1983-05-24

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-12-11

Shut-In

Plugged

1984-09-25

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (2)

IntervalType
3,842–4,839 ftPerforated
4,687–4,690 ftPerforated

Casing (4)

SizeSet DepthCement
8.625"532 ft350 sx
2.375"4,597 ft
2.375"4,601 ft
5.5"5,476 ft980 sx

Permit History (2)

Applications (2)

#196115 A LA. CAMPBELL ENERGY CORP.
received 1983-05-24
#142241 A LA. CAMPBELL ENERGY CORP.
received 1981-11-24

Records & Logs

2 completion filings on record.

W-2/G-1 1983-06-01
W-2/G-1 1982-01-29

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WHARTON County.

Well Details

Well Number
1
Max Depth
5,500 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
1981-12-11

Operator

Location
VIDALIA
P-5 Status
Inactive (filed 1987-06-23)
Total Permits
18